Close Menu
    Arabian InquirerArabian Inquirer
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Arabian InquirerArabian Inquirer
    Home » POWERCHINA’s Gribo-Popoli Hydropower Station Announces Connection to Grid and Commencement of Commercial Operations
    PR Newswire

    POWERCHINA’s Gribo-Popoli Hydropower Station Announces Connection to Grid and Commencement of Commercial Operations

    July 8, 2024
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    Green Energy Cooperation Deepens Between China and The Republic of Cote d’Ivoire

    BEIJING, July 8, 2024 /PRNewswire/ — Power Construction Corporation of China (“POWERCHINA” or “the Company”) announced that the first unit of the Gribo-Popoli Hydropower Station project on the Sassandra River in the Republic of Cote d’Ivoire’s Soubre province, constructed by the Company, successfully completed a 72-hour trial operation on June 5, 2024, achieving grid connection and power generation ahead of schedule and officially entering commercial operations. This success will expedite economic and social development in Cote d’Ivoire by balancing income and expenditure in the power sector, significantly improving the livelihoods of residents.

    POWERCHINA's Gribo-Popoli Hydropower Station in Côte d'Ivoire Achieves Early Grid Connection and Power Generation with First Unit

    Gribo-Popoli Hydropower Station Project is located downstream from the POWERCHINA-completed Soubre Hydropower Station. It is the second power station undertaken by the Company along the quickly developed Sassandra River Basin. The power station is equipped with three cross-flow units with a total installed capacity of 112.9MW and a storage capacity of 82 million cubic meters. The dam is 4.2 kilometers long with a maximum height of approximately 18.58 meters. Since the project officially started in August 2021, the on-site team has overcome multiple challenges and successfully promoted the implementation of the project, adding clean electricity to Cote d’Ivoire.

    Once put into full operation, the Gribo-Popoli Hydropower Station project will further exert huge economic and social benefits. The project will help Cote d’Ivoire achieve its dual carbon emission reduction goals and generate additional energy to support neighboring countries. By providing surplus electricity, the country will enhance its role as a key energy provider in West Africa, benefiting the entire region.

    Gribo-Popoli Hydropower Station General Manager, Mr. Noumory Sidibe, commented: “This is a key project in the implementation of Cote d’Ivoire’s clean energy development strategy that will make a positive contribution to the expansion of the country’s power supply and foreign exports.” Governor KONE also expressed satisfaction with the project’s progress, noting that the completion of the Gribo-Popoli Hydropower Station will make Soubre Province a source of pride for the entire nation.

    The Gribo-Popoli project integrates deeply with the local community, focusing on large-scale construction and providing significant assistance. The project team has repaired roads and built primary schools, fostering close ties with residents. The repaired road section, crucial for its high traffic, connects St. Mary’s medical Clinic and the Total Energy gas station. Previously severely damaged, the repair has greatly enhanced convenience and safety for the community.

    Looking ahead, POWERCHINA is continuing to bring more clean energy to the African region and achieve mutually beneficial results in an increased number of areas.

    About POWERCHINA

    Founded in 2011, Power Construction Corporation of China (POWERCHINA) is a leading construction group specializing in investment and financing, planning and design, engineering construction, equipment manufacturing, and operation management. The company ranked 105th among the Fortune 500 in the year 2023.

    Photo – https://mma.prnewswire.com/media/2455460/image.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/powerchinas-gribo-popoli-hydropower-station-announces-connection-to-grid-and-commencement-of-commercial-operations-302190545.html


    Related Posts

    Phygital Contenders Astana 2026 Wraps Up with New Champions and Games of the Future 2026 Qualifiers Confirmed

    June 15, 2026

    STARTRADER Hosts KTH Alumni Evening in Dubai, Connecting AI, Technology, and Innovation Leaders

    June 15, 2026

    Building the AI-First Gulf: How GCC Enterprises Are Entering the Next Digital Era

    June 13, 2026

    LG Elevates the Big Game Experience with Ultimate Match Watching Bundle Offer

    June 12, 2026

    Hisense Celebrates FIFA World Cup 2026TM Kickoff with RGB MiniLED Innovation

    June 12, 2026

    LG Electronics Launches DUALCOOL™ AI in the GCC, Redefining Home Comfort with Smart Technology and Cleaner Air

    June 12, 2026
    Latest News

    South Korea tops Czechia 2-1 in FIFA World Cup Group A

    June 12, 2026

    ZAPOPAN, MEXICO / Content Syndication Services / – South Korea opened its FIFA World Cup Group A…

    KSQF UNICEF project helps children leave Congo mines

    June 11, 2026

    UAE and US discuss UN cooperation in Abu Dhabi

    June 11, 2026

    Kuwait flights resume after brief airspace closure

    June 11, 2026

    Samsung leads global chip investment with US$59.2B spend

    June 10, 2026

    DR Congo Ebola cases rise to 598 as deaths reach 115

    June 10, 2026

    Nvidia expands South Korea AI and data centre deals

    June 9, 2026

    FAO backs $3.9bn GEF-9 funding for food security

    June 8, 2026
    © 2026 Arabian Inquirer | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.